25 - 27 February, 2020 | Pestana Chelsea Bridge Hotel, London, United Kingdom

Gavin Gerrard

Operations Manager BAM Nuttall

Gavin is Operations Manager for BAM Nuttall with overall responsibility for the development  of the Offshore Wind sector within the business.  Gavin was the project lead for the Blyth Offshore Demonstrator Project which saw the first use of float and submerge GBF technology for an offshore wind farm.

On completion of the Blyth project he led the BAM team responsible for the refinement of the GBF solution and the development of the manufacturing methodology for the mass deployment of float and submerge foundations.

He is a chartered civil engineer with more than 30 years’ experience in the design and construction of complex heavy civils projects, including a number of significant concrete floating structures.

Agenda Day 2

Sunday, August 2nd, 2020

11:10 AM Local content and cost competitivity with Ideol’s concrete hulls

• 1500 jobs in the construction of a 600 MW floating wind farm
• Achieving cost competitivity with industrialised serial construction methods
• How scaling up to 15 MW impacts on the economics of floating wind farms based on the DampingPool®

Check out the incredible speaker line-up to see who will be joining Gavin.

Download The Latest Agenda