Media Center | Offshore Wind Power Conference

Full Agenda | 9th International Conference Offshore Wind Power Substations 2022

After two chaotic years, this conference returns live and in-person on 30 August – 1 September 2022 in Bremen, Germany. Meet experts from Tennet, EnBW, DNV, SSE Renewables, Ocean Winds, Ørsted and other leading companies. Hear best case studies and interact with industry experts d ...

Sponsorship enquiry

Partner Content: Offshore Wind Power Substations - Partner Agenda - Get the Info!

MINIMIZE LOSSES, INVESTMENT AND COSTS WITH IMPROVED ELECTRICAL DESIGN AND IMPROVED INSTALLATION This three day, tailor-made conference Co-located with our International Conferences Offshore Foundations and Wind Turbine Towers events, attracts the globe’s best and brightest decision makers in wind tech and more! Will you be among them? Download the updated...

Presentations

COWI on challenges and future trends of substation jacket foundation design for very deep water

COWI shared unique design ideas adopted in projects at last year's Offshore Wind Power Substations conference. Read the presentation and find out more about challenges of the substation foundation design, from procurement, fabrication and installation perspective.

Atkins Presentation: Return on Experience from the Foundation Design of Numerous Offshore Substations

Mathieu Guinard, Principal Geotechnical Engineer, Atkins, United Kingdom, presented at last year's "Offshore Wind Power Subsattions" on the experience made from concept through to installation of numerous offshore substations in European waters.

TenneT Presentation: The Road to 2GW Offshore HVDC Grid Connections

Learn more about the offshore HDVC grid connections by reading this presentation prepared by Marien Ruppert, Asset Management TenneT

TenneT Presentation on "The future of Offshore Grid Connections"

Download now for free the TenneT past presentation by Marien Ruppert, Asset Manager at TenneT Netherlands. Learn more about:• Case study IJmuiden Ver (NL) & Zone 3 (GE)• Powerlink Islands or HVDC platforms• Cost drivers, saving potential and moreDownload the presentation here:

Iberdrola Renewables case study - Wikinger substation: From scratch to production

With the constant changes in technology, the offshore wind power substations require more and more complex implementation processes. Would you like to expand your knowledge within this area? Download the case study "Wikinger substation: From scratch to production" presented by Alfonso Martinez Carminero, OSS Package Lead at Iberdrola Renewables in...

EnBW Energie Baden-Württemberg: Experiences and lessons learnt with Baltic 1 and 2 OSS

Friedrich von Storch, Manager Operations Wind Offshore, EnBW Energie Baden-Württemberg AG, Germany, presented at last year’s „Offshore Wind Power Substations“ experiences and lessons learnt with Baltic 1  and 2 OSS. Read the full presentation to find out more.

Wikinger substation: From scratch to production

Alfonso Martinez Carminero, OSS package lead, Iberdrola Renewables, discusses in this exclusive interview all details regarding the Wikinger offshore substation.

Articles & Reports

Why to attend

Read more about key topics, our offer onsite and what you can gain from attending the 9th International Conference Offshore Wind Power Substations

7 News on Wind Power Substation Projects you might have missed

Read the article and find out more about latest updates on wind power substation projects.

Whitepaper on scour and scour prediction in the vicinity of offshore constructions

Dr. Peter Menzel and Dr. Mathias Paschen, University of Rostock, published a whitepaper on “Scour and scour prediction in the vicinity of offshore constructions” where they performed laboratory tests in the water-channel of the University of Rostock on a model of a monopolile and selected elements of a jacket structure....

Interviews

Expert Interview with RTE France

As the improvements on OSS seem to be a reason for the delay or even limit standardization, Energy IQ talked exclusively to RTE France’ Substation Project Manager, Daniele Bortugno about the OTM technology and company`s vision on the French market. Get a deeper knowledge on this topic by downloading the...

Case Study on the Long-Term Transition in the Power Systems with Dr. Henrich Quick from 50Hertz Transmission GmbH

Energy IQ conducted an exclusive interview with Dr. Henrich Quick and discussed the following topic areas: - the first hybrid interconnector in offshore wind- additional offshore grid connections- new combined grid solutions

Inside Siemens' OTM: Expert Interview with Michael Grainger

Download the Q&A to learn more about the Siemens achievements on offshore substation concepts!

Substations: Innovation vs. Standardisation? Expert Interview with Iberdrola Renewables

Energy IQ discusses exclusively with Iberdrola Renewables' OSS Package Lead, Alfonso Rodriguez Caminero about the most critical aspects of this industry segment such as the loggerheads between design innovation and standardization, risks in project execution and much more. Get a deeper knowledge on this topic by downloading the Iberdrola Renewables...

Interview with Dr. Peter Menzel on Scour and Scour Protection at Offshore Jacket Structures and Cables

What are the main scouring effects to be observed on offshore structures and cables? Which scour protection systems are currently available and how could they be improved?Dr. Peter Menzel, Researcher, Rostock University, Germany, answers these and more questions in this interview.