Case Study on the Long-Term Transition in the Power Systems with Dr. Henrich Quick from 50Hertz Transmission GmbH

Case Study on the Long-Term Transition in the Power Systems with Dr. Henrich Quick from 50Hertz Transmission GmbH

Energy IQ conducted an exclusive interview with Dr. Henrich Quick and discussed the following topic areas: 

- the first hybrid interconnector in offshore wind

- additional offshore grid connections

- new combined grid solutions


Please note: That all fields marked with an asterisk (*) are required.



This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.