Thomas Bleikamp

Package Manager OSS/Grid/Scada; Offshore Wind Park Kaskasi RWE

Agenda Day 1

12:40 PM Keynote | Engineering and design patterns: Evaluation of design approach harmonization/standards versus tailor-made solutions

  • Why it does make sense to deep dive into the question if harmonization/ standardization or tailor-made designs for Offshore Substations shall be applied w.r.t. costs and risks
  • The utilization of selected standards included in a mainly tailormade design will be considered
  • Cost reduction by using 66kV wind turbine grid voltage and the result after feasibility study for Kaskasi at Innogy

Agenda Day 2

11:10 AM Round Tables A | B | C

Table A | Offshore substation design in view of power 2 gas

Thomas Bleikamp, Package Manager OSS / Grid / SCADA, Offshore Wind Park Kaskasi, Innogy SE


Table B | Design philosophies and impact on operational costs


Table C | Life extension of substations

Agenda Day 3

9:00 AM Workshop A: Engineering and design patterns: Evaluation of design approach harmonization

  • Standards versus tailor-made solutions: Cost drivers and saving potential
  • Why it does make sense to deep dive into the question if harmonization/standardization or tailor-made designs for Offshore Substations shall be applied w.r.t. costs and risks
  • The utilization of selected standards included in a mainly tailor-made design will be considered
  • Cost reduction by using 66kV wind turbine grid voltage and the result after feasibility study for Kaskasi at innogy