11:30 Novel design for Airtight Platform support, solving the fabrication and pile driving challenges

• It has been a longstanding challenge to solve airtight platform support design, which is

severely exposed during pile driving installation.

• Innovative Design: In collaboration with Developer, COWI has designed a solution with no

welding to MP, providing significant risk-reduction and steel savings.

• Full-scale testing with manufacturer to prove the functionality ahead of installation.

• Certification achieved in 2024 with installation and commissoning completed