• It has been a longstanding challenge to solve airtight platform support design, which is
severely exposed during pile driving installation.
• Innovative Design: In collaboration with Developer, COWI has designed a solution with no
welding to MP, providing significant risk-reduction and steel savings.
• Full-scale testing with manufacturer to prove the functionality ahead of installation.
• Certification achieved in 2024 with installation and commissoning completed
in 2027.