Steve Lewis

Steve Lewis

Project Director - Community Power Networks Ausgrid
Steve Lewis

Agenda Day 1

3:00 PM Case Study: No Precedent. Same Pressure. What It Takes to Deliver What Australia Has Never Built Before

The first program of its kind was approved and delivered under the AER. No historical budget data. No existing workforce configuration to draw from. No playbook. The practitioner names the specific decisions made when every standard assumption was wrong before the program started — and what those decisions mean for the next generation of programs entering the pipeline.


Key Takeaways:

  • When there is no precedent, supply chain assumptions from the last program are wrong before you start 
  • Cost escalation on a first-of-kind program carries a premium no standard budget account for 
  • The workforce this type of program needs does not exist in the configuration required 
  • Three things the practitioner would do differently on Day 1 

Check out the incredible speaker line-up to see who will be joining Steve.

Download The Latest Agenda