New Zealand's transmission system operator sets out what the Net Zero Grid Pathways programme means in practice - the investment required, the timeline, and the decisions the rest of the sector needs to make.
$100 billions of transmission and distribution investment needed by 2050 - what the first decade looks like and what it requires from generators, regulators, and government
The connection queue from the inside: how Transpower is managing 6 GW of enquiries and what structural changes would accelerate the process
What the transmission system needs from storage, demand response, and generation location that the current pipeline isn't yet providing
Check out the incredible speaker line-up to see who will be joining John.
Download The Latest Agenda